Test Manager Snapshot
Filtering Widgets

Every widget supports configurable filters. Click the three-dot menu on any widget to apply filters and narrow down the displayed results based on your specific criteria.

Drill Down into Data

All widgets support drill-down. Click on any data point in a chart (such as a segment in a pie chart, a bar in a bar chart, or a status value) to view the underlying list of associated records (e.g., test cases, test runs, or issues) that make up that data point.

Viewing All Time​

A dashboard made up only of Test Manager widgets offers an extra All time option in the dashboard date range picker. It starts from the first test case created in your organization, so you can see your whole test management history in one view.

Dashboard date range picker with the All time option, on a dashboard of Test Manager widgets

How it works?​

  • All time is listed only when every widget on the dashboard is a Test Manager widget.
  • For ranges of a year or more, including All time, the interval can be set to Weekly or Monthly only. Monthly is selected by default.
  • There is no previous-period comparison on All time, because there is no earlier period to compare against.
  • Shared dashboard links and PDF exports use All time as well.

Adding other widgets later​

If a widget from another module is added to the dashboard, the dashboard follows the date ranges available to that module:

  • A saved All time range, or a long preset that reaches further back than your data retention period, switches to Last 30 Days and a notice tells you the range was changed.
  • A pinned date range that was set on a Test Manager-only dashboard and starts before your data retention period is not applied, and the dashboard falls back to a supported range. The pinned range itself is kept.
note

Remove the non-Test Manager widgets from the dashboard to make All time available again.

Test Cases Summary​

The Test Cases Summary widget displays the total count of test cases and the split between Automated and Manual test cases. The classification is determined by the Automation Status field on each test case. If set to Automated, it is counted under Automated; all others fall into the Manual category.

How it works?​

  • View the total number of unique test cases created in your project.
  • See the breakdown between Automated and Manual test cases based on the Automation Status field.

Value Proposition​

This widget gives you a quick snapshot of your test case inventory and the balance between automated and manual coverage, helping you plan your testing strategy.

Test Cases Trend​

The Test Cases Trend widget tracks the number of test cases created over a period of time, split by Automation Status, helping you visualize how your test suite is growing and how much of it is automated.

Test Cases Trend widget in Stacked Bar view

How it works?​

  • Test cases created in the selected period are grouped into time buckets and stacked into Automated and Manual, using the same Automation Status classification as the Test Cases Summary widget above.
  • Click the three-dot menu on the widget, select Configure Widget, and use View under Display Options to switch between three presentations:
    • Stacked Bar (default) - one bar per interval, segmented by Automation Status.
    • Stacked Area - the same series drawn as areas, to emphasise the overall shape.
    • Table - a breakdown by project or by test case creator, with the counts sortable by column. See Table view below.
  • Click a bar segment to drill down into the test cases behind it. Only the segment you click is listed - Automated or Manual - not the whole bar.
  • A dashed line plots the equivalent total for the preceding period of the same length, so you can compare the current window against the one before it. The legend shows the dates that period covers. The line appears only when the preceding period contains at least two complete intervals, so a short date range viewed at a coarse interval - for example a single month of data viewed monthly - may not have enough history to draw it. The line is not shown when the dashboard is set to All time.
  • Change the interval (Daily, Weekly, Monthly) to re-bucket the trend.

Table view​

With View set to Table, two more settings appear under Display Options: Table rows chooses what each row represents, and Table columns chooses how the counts are split.

Table rows

  • Project (default) - one row per project.
  • Created by - one row per user who created test cases, labelled with the user's display name. If two users share a display name, their username is added in brackets to tell them apart. A creator who cannot be identified is shown as User #<id>.

Table columns

  • Total (default) - Automated, Manual and All counts for each row across the whole date range.
  • By period - one column per day, week or month, following the dashboard interval (Daily, Weekly or Monthly). Weekly columns are labelled with the week number and its start date, for example W41 · Oct 05. Each period shows Automated and Manual counts, a Total block sums each row across the range, and a Total row at the bottom sums each column.

As in the chart, Manual counts every test case whose Automation Status is not Automated.

Sort by the Automated, Manual or All column (in By period, the ones in the Total block) to rank rows, and select any count to drill down into exactly the test cases behind it - for that row, and in By period, for that period. The table lists up to 50 rows, ordered by the number of test cases created - if there are more, the widget states how many of the total are being shown.

Test Cases Trend widget in Table view, broken down per project Test Cases Trend tables with Table rows set to Created by and to Project Test Cases Trend table with Table columns set to By period at a Daily interval

Value Proposition​

This widget helps you track how your test suite evolves over time, identify periods of high or low activity, and see how much of your growth is automated versus manual. The table view turns the same data into a per-project or per-creator comparison, so you can see which projects or team members are contributing coverage, and the By period columns show when that coverage was added.

Test Runs Summary​

The Test Runs Summary widget provides an overall summary of your test runs, with the data split by test instance statuses and their counts. You can view it as a pie chart or a stacked bar, or drill through your projects and test run folders to find exactly which area of your suite is failing.

How it works?​

  • Displays the total number of test runs and the breakdown of test instances by status (Not Started, Passed, Failed, Skipped, and custom statuses).
  • Quickly identify test runs with the highest number of failed or pending instances.
  • Choose how the widget is drawn with the graph type setting described below.

Choosing how the widget is drawn​

Open the three-dot menu on the widget, select Configure Widget, and use Display Options to pick the graph type. The choice is saved per widget, so two Test Runs Summary widgets on the same dashboard can be drawn differently.

Select graph type under Display Options in Configure Widget, with Test Run Folder Hierarchy selected
  • Pie Chart (default) - the overall split of test instances by status.
  • Stacked Bar - one bar per test run, with stacked segments by status.
  • Test Run Folder Hierarchy - one bar per project, which you can keep drilling into through its test run folders.

Drilling through projects and test run folders​

With Test Run Folder Hierarchy selected, each click takes you one level deeper:

Test Runs Summary showing one stacked bar per project at the first level
  • The first level shows one bar per project, stacked by test instance status.
  • Click a project to see its top-level test run folders. Click a folder that has subfolders to go one level deeper.
  • Every folder bar counts the test instances in that folder and in all of its subfolders.
  • A folder that has no subfolders is the end of the trail. Clicking it opens the test instance list for that folder. Click a status segment of that bar to open the list already filtered to that status.
  • The breadcrumb above the chart shows where you are, for example All projects › Checkout › Regression. Select any entry in the trail to jump straight back to that level.
  • The level indicator on the right of the breadcrumb shows how deep you are and how much further the deepest branch goes, for example Level 2 of 4 · folders.
Test Runs Summary drilled into a project's test run folders, with the breadcrumb and level indicator

Individual test runs are not shown as bars. Drilling stops at the deepest folder, and the instance list opens from there.

Test instance list opened from the deepest test run folder, filtered to the clicked status
note

A project bar counts every test instance in that project, including instances whose test run is not in a folder. A project's total can therefore be higher than the sum of its folder bars, and a project with no foldered test runs opens an empty folder level.

tip

Need the instances of a test run that sits directly inside a folder that has subfolders of its own? Switch the graph type back to Pie Chart or Stacked Bar and open the instance list from there.

On shared and demo dashboards the bars are read-only: the chart is shown, but clicking a bar does not drill in or open the instance list.

Value Proposition​

This widget gives you a high-level view of test run health across your project, helping you prioritize runs that need attention and track overall execution progress. Drilling through your projects and test run folders narrows failures down to the specific area of your suite responsible, without leaving the dashboard.

The Milestone Trends widget displays a stacked bar chart of milestones, with each bar broken down by test instance statuses from the associated test runs. You can drill into a milestone to see the results of individual test instances, or step down through your test run folders to find exactly which area of your suite is failing.

Milestone Trends widget showing one stacked bar per milestone

How it works?​

  • Each bar represents a milestone, with stacked segments showing the count of test instances by status.
  • Supported statuses include Not Started, Passed, Failed, Skipped, as well as any custom statuses created for your manual test runs.
  • Filter the data by date range to analyze milestone performance over specific time periods.
  • Click a milestone bar to drill in. What opens depends on the Milestone Drill Down setting described below.
note

A test run that belongs to more than one milestone is counted in each of those milestones, so the milestone bars are not expected to add up to a single project total.

Choosing what a milestone opens​

Open the three-dot menu on the widget, select Configure Widget, and use Display Options to set Milestone Drill Down. The choice is saved per widget, so two Milestone Trends widgets on the same dashboard can behave differently.

Opening Configure Widget from the three-dot menu on the Milestone Trends widget Milestone Drill Down setting under Display Options in Configure Widget
  • Instance List (default) - clicking a milestone opens the list of test instances for that milestone.
  • Test Run Folder Hierarchy - clicking a milestone opens its top-level test run folders as bars, which you can keep drilling into.

Drilling through test run folders​

With Test Run Folder Hierarchy selected, each click takes you one level deeper into your folder structure:

  • Every bar is a folder, and its value counts the test instances in that folder and in all of its subfolders.
  • A folder that has no subfolders is the end of the trail. Clicking it opens the test instance list for that folder.
  • The breadcrumb above the chart shows where you are, for example All milestones › Regression › Checkout. Select any entry in the trail to jump straight back to that level.
  • The level indicator on the right of the breadcrumb shows how deep you are and how much further the deepest branch goes, for example Level 2 of 4 · folders.
Milestone Trends widget drilled into a test run folder, with the breadcrumb and level indicator

Individual test runs are not shown as bars. Drilling stops at the deepest folder, and the instance list opens from there.

Test instance list opened from the deepest test run folder
tip

Prefer to see instance results straight away? Switch Milestone Drill Down back to Instance List. This is also how you reach test runs that sit directly inside a folder that has subfolders of its own.

Filtering by test run folder​

The Test Run Folder Name filter narrows the widget to one part of your folder structure. It is available in Configure Widget, and in the dashboard Filters drawer on any dashboard that contains a Milestone Trends widget.

  • Selecting a folder matches that folder and everything beneath it, so you can scope the whole widget to a single area of your suite.
  • If the same folder name is used in more than one place, all of them are matched. This lets you select a name such as login once and review every folder that uses it together.
Test Run Folder Name filter in the Configure Widget drawer

This mirrors the Test Case Folder Name filter used elsewhere in Test Manager widgets.

Value Proposition​

This widget helps you quickly assess milestone health, identify milestones with high failure rates, and monitor release readiness. By tracking status trends across milestones, you can spot regressions early and make data-driven decisions about testing effort. Drilling through your test run folders narrows a failing milestone down to the specific area of your suite responsible, without leaving the dashboard.

Issue Summary​

The Issue Summary widget shows the trend of issues and requirements linked to test cases or raised during test runs in Test Manager.

How it works?​

  • Tracks issues linked to test cases as well as issues raised directly within test runs.
  • Visualize whether issues are increasing or decreasing over time.

Value Proposition​

This widget helps you monitor the volume and trend of issues across your testing efforts, enabling you to identify patterns and prioritize resolution.

Test Cases Types​

The Test Cases Types widget displays a pie chart of test cases split by their Type field (e.g., Regression, Smoke, Sanity, or any custom type defined in your project).

How it works?​

  • Each segment of the pie chart represents a test case type, based on the Type field of each test case.
  • Quickly see the distribution of test case types across your project.

Value Proposition​

This widget helps you understand the composition of your test suite and ensure the right balance of test types (Regression, Smoke, Sanity, etc.) for effective coverage.

Execution Progress​

The Execution Progress widget displays overall test execution progress as a percentage on a visual gauge, alongside a breakdown of total, executed, and remaining test run instances.

Execution Progress and Test Execution Burndown widgets

How it works?​

  • The gauge shows the completion percentage, computed as (Total test run instances − Not Started instances) / Total test run instances.
  • Any test instance in a status other than Not Started (such as Passed, Failed, Skipped, Blocked, or custom statuses) is counted under Executed.
  • A side panel next to the gauge displays three counters:
    • Total: the total number of test run instances in scope.
    • Executed: instances that have moved out of the Not Started status.
    • Remaining: instances still in the Not Started status.
  • Apply filters from the three-dot menu to scope the widget to a specific test run, phase, or stage.

Value Proposition​

This widget gives you a single at-a-glance metric for test execution progress, making it easy to track how close a release, milestone, or phase is to completion and to communicate status to stakeholders without drilling into individual runs.

Test Execution Burndown​

The Test Execution Burndown widget tracks how remaining test executions trend down over the duration of a test run, and surfaces a rich footer strip of delivery metrics so you can forecast whether execution will complete on time.

How it works?​

  • The X-axis represents dates across the selected execution window, and the Y-axis represents the number of remaining test run instances (instances still in Not Started status).
  • Three trend lines are plotted:
    • Actual (solid blue): remaining Not Started instances per day, reflecting real execution progress up to today.
    • Expected (dashed grey): an ideal linear burndown from the total instance count on Day 0 down to zero on the final day.
    • Projected (dashed blue): a forward-looking extrapolation from today to the end date, based on your current velocity, so you can see where execution will land if the current pace holds.
  • A Today marker highlights the current date on the chart, making it easy to see where the Actual line hands off to the Projected line relative to the Expected ideal.
  • Hovering over any point on the chart opens a tooltip showing, for that day:
    • Remaining: remaining instances on that date.
    • Ideal: the expected remaining count for that date.
    • Gap: how far ahead or behind the ideal line you are.
    • Executed today: the number of instances executed on that day.
    • 7-day avg: the trailing 7-day execution velocity.
  • The footer strip below the chart summarises execution health at a glance: Total, Executed, Remaining, Complete (percentage), Status (ahead or behind by N instances), Velocity (instances/day), projected Finish date, and the Pace needed (instances/day required to hit the target).
  • Use the date range picker in the widget header to change the execution window. Use the filter icon (next to the Test Manager badge) or the three-dot menu to filter by test run, phase, or stage.

Drill down into remaining instances​

Clicking any point on the Actual line opens a drill-down modal titled Test Execution Burndown, which lists every test run instance that was still Remaining as of that date. From the modal you can:

  • See the exact count of remaining instances for the selected date (e.g. Remaining as of Mar 14: 1000).
  • Adjust the date range and apply additional filters: Project, Test Run Instance Name, and Milestone Name.
  • Browse the paginated list of instances with their current status, project, and last-updated timestamp.
  • Export the list for sharing or offline analysis.

Value Proposition​

By comparing the actual burndown against the expected line and watching the footer metrics, you can quickly see whether execution is ahead, on track, or slipping, enabling early course correction, better capacity planning, and more reliable release predictions. The drill-down makes it easy to go from a high-level slip directly to the specific instances that are holding the run back.

Defects by Severity​

The Defects by Severity widget displays a bar chart of Jira defects linked to your test cases and test runs, grouped by their Jira priority.

How it works?​

  • Each bar represents a priority from your Jira project's own priority scheme (for example Critical, High, Medium, and Low, or custom values such as Blocker, Major, and Minor) with its value showing the count of linked Jira defects at that priority.
  • Only priorities present in the selected range are charted. Defects with no priority set are grouped under Unknown, shown last.
  • Defects are sourced from Jira issues linked to test cases or raised during test runs in Test Manager.
  • Click any bar to drill down into the underlying list of issues for that priority.
  • Apply filters from the three-dot menu to scope the widget to a specific test run, phase, or stage.

Value Proposition​

This widget helps you assess release risk at a glance by surfacing how many high-impact defects are outstanding. By focusing on your highest priority bars first, you can prioritize the issues most likely to block a release.

Tester Assignment​

The Tester Assignment widget displays a horizontal stacked bar chart with one bar per assigned tester, showing the workload and execution progress of each tester side by side.

How it works?​

  • Each bar represents a tester, identified by their Display Name, and its length reflects the total number of test run instances assigned to them.
  • Each bar is broken down into stacked segments by test instance status: Not Started, Passed, Failed, Skipped, as well as any custom statuses created for your manual test runs.
  • Click any segment to drill down into the underlying list of test run instances for that tester and status.
  • Apply filters from the three-dot menu to scope the widget to a specific test run, phase, or stage.

Value Proposition​

This widget lets you compare workload and execution progress across testers at a glance, making it easy to spot uneven assignment, identify testers who are behind, and rebalance effort to keep a release on track.

Continuously Failing Test Cases​

The Continuously Failing Test Cases widget lists the test cases whose latest runs all failed, so you can find the tests that keep breaking and fix them first.

How it works?​

  • A test case is listed when its latest N executed runs all failed and its latest run falls in the dashboard date range. Earlier runs outside the range still count towards the N.
  • N is the Always Failing setting in Organization Settings → Org Product Preferences → Insights → Smart Tags (5 runs by default). See Smart tags for test cases.
  • Only Passed and Failed runs are counted. Runs in any other status, such as Not Started, are skipped and do not break a streak.
  • Each row shows the Test case name, with its test case ID and project below it, and Last run at, the time of its latest run in your time zone. The most recently run test cases are listed first.
  • Click a row to open the runs that made the test case continuously failing. Switch from Counted runs to All runs to see every run of the test case in the dashboard date range (extended back to include all counted runs), with the counted runs tagged Counted.
  • Click the test case name to open the test case in Test Manager.
  • Apply filters from the three-dot menu to scope the widget to specific projects or test runs. Use View all to see the full list and Export it as CSV or PDF.

Value Proposition​

This widget shows the tests that fail every time they run, so you can separate broken tests from occasional failures, fix the most persistent problems first, and keep them from hiding new regressions.

Terminal First Testing With Kane CLI

Natural language browser & mobile app tests right from terminal.

×
Schedule Your Personal Demo
Kane CLI terminal

Help and Support

Related Articles